First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

  • @[email protected]
    link
    fedilink
    English
    -3
    edit-2
    1 year ago

    You’re still trying to spread the “90% of nuclear waste is recyclable” myth, but now you’ve retreated to the bailey of “getting 10% more energy is technically getting something out of it so saying it is recyclable is totally true even though this has no impact on mining or the dangerous parts of waste!!” You’re also pretending it magically makes the Pu240 and Am241 go away.

    Reprocessing yields a small fraction of leftover fissile material. It is in no way characterisable as recycling.

    The strategy is a very boring and tiresome propaganda move that is part of the Duke Energy and Rosatom astroturfing playbook. As is the “who me? I couldn’t possibly be slyly trying to imply nuclear waste is actually fuel” act.

    • @[email protected]
      link
      fedilink
      English
      1
      edit-2
      1 year ago

      They never said that it’s 90% recyclable. They said it can be recycled ‘to an extent’. You’re projecting.

      • @[email protected]
        link
        fedilink
        English
        01 year ago

        The myth they are dog whistling is just that. You can see it repeated everywhere the topic comes up and where they tried to conflate it with breeding. The method of lying is called paltering.

        In reality reprocessing has no significant impact other than leaking Cs, Kr and Tc everywhere, increasing the volume of waste so it’s harderto handle and raising costs.